QTS tops out first three buildings at $10 billion Cedar Rapids data campus
Wind kept the ceremonial beam on the ground, but the structural milestone marks the largest economic development project in Iowa history moving from dirt to steel.
Cedar Rapids — High winds kept the traditional signing beam from rising above the Big Cedar Industrial Center on Tuesday, but the topping out ceremony for the first three buildings at QTS's data center campus still marked a visible turning point for the $10 billion project.
QTS, owned by Blackstone, and its general contractors Layton Construction and The Weitz Company gathered with state and local officials to mark completion of the structural framework on the first phase of a 612-acre campus planned for seven buildings ranging from 400,000 to 1.2 million square feet each.
The project is described by multiple officials as the largest economic development investment in Cedar Rapids and Iowa history. Governor Kim Reynolds, Lieutenant Governor Chris Cournoyer, Senator Charlie McClintock, Representatives Jeff Cooling and Elizabeth Wilson, and Mayor Tiffany O'Donnell have all publicly backed the development.
Construction is split into two phases: the first expected to finish in 2026, the second in 2027. The campus will use water-free, energy-efficient cooling systems. Alliant Energy will serve the site.
More than 2,000 construction and permanent jobs are projected across the region, though the breakdown between temporary and long-term positions has not been disclosed. No tenants have been announced for the facility.
The topping out follows an August 2025 announcement and a canceled July groundbreaking after a shooting in the Manhattan building housing QTS's parent company. Mayor O'Donnell said at the announcement that QTS "represents a new era for Cedar Rapids — one defined by innovation."
Keep Cedar Rapids in your morning
Get The Pulse, Daily free and unlock every game in Pulse Arcade.
Already subscribed? Use the same email and we’ll send a fresh Arcade unlock link.
Sources
- 1.QTS celebrates topping out milestone at Cedar Rapids data center — CBS2/Iowa's News Now (KGAN)
- 2.Officials hold topping out ceremony for $10 billion Cedar Rapids data center campus — KCRG-TV
- 3.QTS tops out data center in Cedar Rapids, Iowa — Data Center Dynamics
- 4.QTS marks topping out of first three buildings at Cedar Rapids data center campus — Corridor Business Journal
- 5.QTS Celebrates Cedar Rapids Data Center Campus Topping Out Milestone — The Weitz Company
- 6.$10bn data centre campus for Iowa — Global Construction Review
- 7.QTS announces $10 billion data center campus in Cedar Rapids — CBS2/Iowa's News Now (KGAN)
- 8.QTS data center groundbreaking in Cedar Rapids canceled after New York shooting — CBS2/Iowa's News Now (KGAN)
This story was researched and drafted with AI assistance and reviewed by a human editor before publication. Read our Editorial Standards & AI Disclosure. Spot an error? Request a correction.
Handheld lung device from Iowa City startup gets $50K state boost
Pneumero aims to let chronic lung patients monitor breathing at home; the loan covers IP, product work and market planning.
From hip hop to algorithms: Local founders build AI park
The creators behind a new Wellington Heights technology project say the neighborhood installation will launch a fresh generation of innovators.
QTS temporary power plant near Cedar Rapids airport triggers compatibility study
Modular generators planned for data center campus sit two miles from The Eastern Iowa Airport, prompting review before permits are issued.
Cedar Rapids venture studio Novy starts its first healthcare software company
The new platform is designed to improve shift scheduling for emergency medicine groups, with pilot programs planned within 90 days.



